:: Bids and Awards Committee Closed

Jan 20, 2010

ADDENDUM NO. 2010-01-003-1


Category: General
Posted by: bantayan

Standard Form Number: SF-INFR-34                                               Contract Reference Number            2010-01-0003

Revised on: July 29, 2004                                                                   Name of the Contract:    Construction of

Legislative and Judiciary  Building

Location of the Contract: Mun. Government

Center, Suba, Bantayan, Cebu

SUPPLEMENTAL/BID BULLETIN

Republic of the Philippines

MUNICIPALITY OF BANTAYAN

BANTAYAN, CEBU

Tel. nos. (032)352-5190/(032)460-9028

Website: www.bantayan.gov.ph

ADDENDUM NO. 2010-01-003-1

This Addendum No. 2010-01-003-1 is issued to modify or amend items in the Bidding Documents.  This shall form an integral part of the Bidding Documents.

Brief Description of the Scope of Work  As Amended:

I.   Demolition/Clearing of Existing Building        -    -    -      1.4%         -    144 sq.m.

II.   Excavation                                                     -    -    -      1.3%         -    131 cu.m.

III.   Embankment                                                 -    -    -      2.8%         -    300 cu.m.

IV.   Concrete Work

A. Footing                                                       -    -    -      5.3%         -    23.46 cu.m.

B. Columns                                                         -    -    -    17.9%         -    29 cu.m.

C. Beams                                                       -    -    -    16.7%         -    34.6 L.M.

D. Wall Footings                                             -    -    -      2.2   %      -    197.5 cu.m.

E. Slab (Ground Floor)                                   -    -    -      5.2%         -    360 sq.m.

F. Slab (2nd Floor & Roof Beam)                        -    -    -    20.2%         -    465 sq.m.

G. Tie Beam                                                   -    -    -      4.3%         -    10.5 cu.m.

H. Stairs                                                              -    -    -      2.3%         -    Lump Sum

I.   Concrete Gutter                                        -    -    -      1.9%         -    36 L.M.

J.  Concrete Corbel                                        -    -    -      0.4%         -    1.44 cu.m.

V.   Roofing Trusses                                             -    -    -    16.3%         -    Lump Sum

VI.   Plumbing (Rough-In)                                      -    -    -      1.1%         -    Lump Sum

VII.   Electrical (Rough-In)                                           -    -    -      0.7%         -    Lump Sum

For guidance and information of all concerned.

DORIVIC G. ESPINA

BAC Chairman